SIMUL ENERGY
Serving Alberta, Saskatchewan, BC & Manitoba

Certification
coordination.
Without the runaround.

One administrative point of contact across Western Canada for organizing equipment records, coordinating qualified inspections, and connecting clients with independent licensed certification professionals.

Request console
Online
Continue in the secure portal
SIMUL ENERGY is a coordination and document-management provider—not an engineering firm. Engineering analysis, technical decisions, certification, load ratings, design approval, and professional authentication are performed exclusively by independent professionals licensed in the applicable jurisdiction.
01

Describe the request

Tell us the equipment type, location, records available, and professional deliverable being sought.

02

Upload the records

Use your own qualified inspection provider or ask SIMUL to coordinate an independent provider.

03

Stay organized

Receive one partner-issued package, secure records access, and renewal reminder emails.

A tighter scope.
A better process.

SIMUL is the administrative point of contact—collecting client records, checking intake completeness against partner-supplied requirements, coordinating independent providers, and maintaining the completed file.

01

Wellhead Certification Coordination

Administrative coordination for CAOEC-related wellhead and well-control certification requests, including BOPs, supported by client, shop, inspection, and independent-partner records.

BOPsFlanges & spoolsIndependent review
02

Overhead & Lifting Coordination

Administrative coordination of overhead-equipment and purpose-built lifting-device certification requests with qualified inspection and independent licensed partners.

Hooks & blocksMan basketsSpreader bars
03

Load-Rating & Design Review Coordination

Intake and document coordination for clients seeking independently issued load-rating or design-review deliverables for new, custom, modified, or undocumented equipment.

Requested capacitySupporting recordsLicensed partner
04

Records & Renewal Reminders

Secure partner-issued files, client access to submitted records, tracked due dates, and reminder emails before recertification may be required.

Client portalDue-date trackingEmail reminders

SIMUL manages intake, document flow, scheduling, and administrative client contact. Independent licensed professionals determine the technical scope and standards, perform engineering work, and issue and authenticate professional deliverables.

Collect locally.
Review independently.

SIMUL can coordinate on-site collection of measurements, material information, equipment details, and photographs, then organize the records for an independent licensed professional. That professional alone determines whether the information is sufficient and completes any engineering review.

COORDINATION 01

Load-Rating Review Coordination

Choose a coordinated field-information visit or upload an existing package. SIMUL organizes identification, dimensions, material or PMI information, photographs, intended loading, drawings, inspection results, and available test records for independent professional review.

  • Custom lifting devices
  • Modified equipment
  • Missing or unclear ratings
  • Replacement rating documentation

COORDINATION 02

Design Review Coordination

SIMUL collects and organizes the available geometry, materials, photographs, configuration, intended-use information, drawings, and history for an independent licensed professional to assess, complete the engineering review, and issue any resulting professional deliverable.

  • New equipment designs
  • Custom-fabricated equipment
  • Design changes
  • Undocumented legacy equipment

SIMUL does not practise professional engineering, make technical determinations, approve designs or load ratings, certify equipment, or issue professional authentication. All such work is performed and issued by the responsible independent licensed professional.

Know the cycle.
Build the right file.

Inspection and certification requirements depend on the equipment, current practices, OEM requirements, service history, and jurisdiction. The independent inspection or certification partner confirms all technical requirements and applicable standards.

CAOEC RP 6.03-year Level IV

BOP & wellhead equipment

  • Ram and annular BOPs
  • Rotating BOPs / rotating heads
  • Working and adapter spools
  • Drill-through spools
  • Wellhead adapter flanges
  • Related well-control components
  • Complete supporting test file
CAOEC RP 4.06-year Level IV*

Service-rig overhead equipment

  • Travelling blocks and hooks
  • Tubing and rod elevators / rod transfers
  • Bails or links and load clevises
  • Rod hooks
  • Tubing and rod swivels
  • Power-swivel load paths and torsion arms
  • Third-party static arms, cables and brackets
WESTERN CANADAScope dependent

Engineered lifting equipment

  • Suspended personnel / man baskets
  • Spreader bars
  • Below-the-hook lifting devices
  • Lift nubbins and lifting subs
  • Custom lifting frames and attachments
  • Structural repairs and modifications
  • Rated-capacity documentation

*Current CAOEC RP 4.0 specifies a five-year Level IV interval for McKissick® blocks. OEM instructions, jurisdictional requirements, service history, or the certifying partner may require a different interval.

Coordination readiness

Organize the supporting records.

Use your own qualified inspection provider or ask SIMUL to coordinate one. We perform an administrative intake check and route the records to the independent professional responsible for technical sufficiency and certification decisions.

Open document portal

YOUR PROVIDER OR OURS

Qualified NDT

The independent inspection and certification providers confirm the required methods, personnel qualifications, procedures, and records for each request. Submit current credentials and traceable results when available.

WELLHEAD EVIDENCE

Four core records

  • Pressure-test record
  • NDT report
  • Dimensional measurements
  • Positive material identification (PMI)

Records that stay with you

Stored, accessible, and tracked.

SIMUL maintains each submitted certification package under the client’s signed-in account. Clients can return to the portal to view their equipment history and download available records at any time.

When a certification due date is provided, SIMUL tracks it and includes renewal reminder emails as part of the service so upcoming work can be planned before the equipment expires.

Final inspection and certification requirements remain equipment-, jurisdiction-, OEM-, standard-, and partner-dependent.

A clear coordination model

One request.
Coordinated end to end.

SIMUL coordinates the administrative path from client records to independently issued professional deliverables. SIMUL does not provide engineering services.

01REQUEST

Send the equipment details, available records, and the independent professional deliverable being sought.

02ORGANIZE

SIMUL checks administrative intake completeness against information requested by the independent partner; no technical determination is made.

03CONNECT

The file is routed to the appropriate independent inspection and licensed professional providers.

04RETURN

SIMUL makes the independently issued package available and keeps the client record organized.

05REMIND

We track the provided due date and send administrative reminder emails before the next anticipated cycle.

Tell us where the equipment stands.

Whether you have a complete inspection file or only an equipment list, SIMUL can coordinate the next administrative step with the appropriate independent provider.

CAOEC + WELLHEAD

Wellhead certification or recertification

Submit the pressure-test record, NDT report, dimensional measurements, PMI results, identification, and previous certification for independent professional review.

CAOEC + OVERHEAD

Overhead certification or recertification

Submit the equipment identification, inspection and NDT evidence, drawings, rating information, and available test records.

PARTNER-ISSUED CERTIFICATE

Load rating or design certificate

Send the available drawings, dimensions, materials, intended use, loads, and equipment history. The independent licensed professional defines the technical review package.

Ready when the work is

Need certification
coordination?

Send the available information. We’ll organize the intake and connect the request with the appropriate independent providers, who determine all technical requirements.

Clear scope. Transparent pricing.

Every request is assessed individually. Before work begins, you’ll receive a clear written estimate outlining SIMUL ENERGY’s coordination charges and any third-party inspection or professional fees.

Open the client portal